In the few days since we've closed for the season a ton of work has already gone into disassembling and removing the Quad, Triple, and Double to make way for construction to begin on the Voyageur Express Six.  First, crews gently lowered the Original Double's haul rope (wire cable that holds the chairs) onto 4x4s. The wood will protect the rope as it is reeled up over the ground keeping it in perfect condition so that it can be used to replace the current haul rope on the Bear Creek Double later this summer. 

The Original Double's haul rope awaiting the final trip around the bull wheel. - 04/07/2023

Spooling up fifteen thousand pounds of cable stretched out over six thousand feet is no small task, so we enlisted the help of JT and his son Jake from Mountain Wire Rope Service. They came all the way from Pennsylvania with their custom-made spooling machine in tow to help us out. Once the spooling machine was set up, the splice was cut right at the marriage, and one end was attached to the large blue spool shown in the photo below. Once the machine got to turning, the team spent the next two days carefully guiding the rope down the hill around the bull wheel at the base and all the way back up and onto the spool. 

Snowriver crew working with Jake to get the spooling started. - 4/15/2023

The project started on a beautiful warm spring Saturday and by the time the tail end of the rope made its way to the reel on Sunday, we were well into a fierce winter storm. I can't thank the crew enough for sticking it out and working through miserable conditions to wrap it up. With 15k pounds of cable on the spool and a worn and frozen crew ready to head home, we needed to pick the spool up out of the machine and stage it in the parking lot. For this, we looked to our friends at Ruotsala Concrete of Ironwood who have already dropped off their biggest excavator to help dig out the foundations for the new lift. My thanks to Colin for coming out on a Sunday in the freezing rain and snow to help us out!
Colin from Ruotsala's Concrete carries the full spool across the parking lot as the blizzard cranks up. - 4/16/2023

Tower Time

With haul ropes out of the way, the team began the removal of the 75 towers that will come down this summer to make way for wide-open skiing and riding next winter. Our team mounted a set of torches on the back of a snowcat and made their way from tower to tower, cutting all but a small portion of the tower before connecting a cable to the top and pulling it over with another snowcat. Once on the ground, each tower was drug over the snow to the mountaintop parking lot where it will be cut up and sent off for recycling. 

Tower #5 on the Triple getting hooked up to be towed off Borealis. - 04/12/2023

Removing all of these towers from the slopes is going to have a huge impact on the way the mountain skis next winter. Borealis feels like a huge Western cruiser without its towers and the Voyageurs funnel doesn't feel so quite so narrow. Going from 75 towers down to just 10 hidden on trail edge is going to create plenty of opportunity for wide-open cruising on the main face. Check out the before and after photos below!
Voyageur's Highway before - 03/24/2023

Same spot on Voyageurs after haul rope and tower removal - 04/13/2023

Renovations Reboot

Our Facility Maintenance team wasn't about to get left in the dust by the outdoor crews. They've already begun work on numerous renovations to the Lodge at Jackson Creek. This summer we're planning a refresh of the entire first floor of the lodge, including Dudley's, the pool, Legacy Restaurant, and the Lobby. Most of the work has been demo thus far as the crew prepares for the installation of new ceiling treatments, carpeting, walls, furniture, and decor. Check out the renderings of our plans for Legacy. I love the midcentury modern look and feel we're going for and can't wait to see families enjoy dinner here after a great day of skiing next winter. 





 
Stay tuned to my blog over the summer to stay updated on all the improvements we're working on for next season. It's sure to be a busy summer and winter will be here before we know it! I'm already looking forward to welcoming all of our guests back to experience all the changes, but for now, the team and I better kick it into high gear and get to work. 

Comments

Popular posts from this blog

Concrete Time

With all of the snow melted and the hill dried out, the team from Ruotsala has focused their efforts on getting each of the tower foundations poured. The new lift will have 10 total towers along the line. Tower 1 sits immediately outside the bottom terminal, and tower 10 is just downhill from the top terminal. Those two tower bases will be excavated and poured alongside their respective terminal foundations. For now, our work has begun at tower 9, near the summit, and is progressing downhill as the access road gets built.  The first step of each tower build is to excavate the tower location down to the precise elevation required according to the size and height of the footing. Once excavated and elevations are verified, soil bearing analysis must be completed to ensure the soil conditions are suitable for the new tower to be placed on. Our friends at Coleman Engineering out of Ironwood perform a series of tests in each excavation to evaluate the soil's ability to bear weight. Once

July Already?!

In the month since I last sat down to chronicle all the activity on the mountain, we have accomplished A LOT. The team from Ruotsalas has completed pouring concrete and backfilled the foundations for Towers 2-10. This leaves Tower 1 and all four terminal foundations to complete but is still a big milestone as it allows us to revegetate the access roads created to reach tower locations on the side of the hill.  The rest of the pours are much more easily accessible via pre-existing and solid roadways, meaning rainy weather is much less of a threat to our forward progress.  Tower 9 foundation is backfilled with grass already growing. -7/8/2023 With the Tower foundations substantially completed, the focus shifts to the top and bottom terminal locations. At the bottom, we are undertaking a massive regrading project to improve skier access to the lift from both the east and the west sides. The loading mound of the former triple lift has been completely removed and redistributed at the bottom

Excitement in the Air

The Big Day After months of work by countless individuals, the time finally came to get the new towers out of the parking lot and stand them up on their foundations. We considered using a conventional crane to lift the towers into place, but the steep terrain would have made it very difficult to move the towers into position and extensive excavation and dozing would have been required to build a crane pad at each tower site. Being that Lutsen is building a lift this summer as well, we choose to partner to split the cost of mobilizing a helicopter from out west to make things a little more efficient for both of us. Saturday, July 22nd, after assisting our friends across the lake with pouring concrete for the new Raptor Express, Brian from Timberline Helicopters pointed his UH 60 Blackhawk across the lake and headed straight for Snowriver. He and his crew touched down here in the main parking lot just after the storm clouds cleared, making for a perfect dust-free landing.  The Timberline